Lumi Paper. Location: Mendlesham, Suffolk
Contract Description: Coat warehouse floor
The specification was simply to coat a new concrete floor.
|
|
|
| |
|
| |
The All England Club. Location: London SW7
Contract Description: Remove existing coating in the Long Bar and repaint
The existing coating kept peeling from the substrate due to poor preparation. All of the coating was removed using a diamond headed grinder. The floor was then cleaned and two coats of Robex Hi Build was applied in ‘Wimbledon green'.
|
|
 |
| |
|
| |
Mediacom. Location: London NW1
Contract Description: Application of Toughseal ito new staff bar
The existing floor was in a bad state of repair and very uneven. The floor was prepared using a diamond headed grinder. Damaged areas were repaired using Robex Dura Quartz. One coat of Toughseal clear followed by two coats of Toughseal were then applied to the floor.
|
|
 |
| |
|
| |
Peterhouse College. Location: Cambridge
Contract Description: Application of Robex Joint Sealant to car park roof
The existing joints were leaking and in a bad state of repair. The joints had to be ‘re instated’ using Robex Dura Quartz. Joint Sealant was then applied to the new joint.
|
|
 |