| |
Client Portfolio |
|
Page 1 | 2 | 3 | 4 |
| |
|
| |
Park Lane Hotel . Location: London
Contract Description: Non Slip Grip Kit to marble entrance.
Before applying the Robex Grip Kit System, the existing tape was removed. The area was then cleaned and treated with a solvent cleaner and abraded to obtain a suitable 'key'.
|
|
 |
| |
|
| |
Trowers & Hamlin. Location London
Contract Description: Repair & Coat plant room floor.
Before applying two coats of Floorguard Hi-Build, the floor was thoroughly cleaned and mechanically abraded using a diamond headed grinder. Any damaged floor areas were repaired using Robex Duraquartz.
|
|
 |
| |
|
| |
Neath Ambulance Station. South Wales
Contract Description: Repair & coat concrete floor
Before applying two coats of Floorguard Hi-Build, the floor was thoroughly cleaned and mechanically prepared by diamond headed grinder and any damaged floor areas were repaired using Robex Duraquartz. |
|
 |
| |
|
| |
Croxley Business Park. Watford
Contract Description: Non-Slip Floorguard Hi-Build to balcony
Before applying Non-Slip Floorguard Hi-Build, the floor was thoroughly cleaned and mechanically prepared by diamond headed grinder.
|
|
 |