Client Portfolio |
|
Page 1 | 2 | 3 | 4 |
| |
|
| |
Wilbury Way Industrial Area. Location Hitchin
Contract Description: Repair & Coat warehouse floor.
Prior to the application of the Toughseal, the floor was mechanically abraded using a Diamond Headed Grinder. The area was then thoroughly cleaned and any damaged areas repaired using Robex Duraquartz.
|
|
 |
| |
|
| |
Galloway Golf, Chessington. Location Kent
Contract Description: Coat Assembly Room Floor
The existing coating was tightly adhered to the floor, therefore the specification was to completely sand the coating and then clean the area with a solvent wash. Two coats of Robex FloorGuard Hi Build were then applied.
|
|
 |
| |
|
| |
Hilton Metropole Hotel. Location London
Contract Description: Apply Robex Hi-Build PU to Kitchen Floor.
The Kitchen floor had become very slippery especially in wet conditions. the existing coating was sanded to provide a 'key' and then solvent washed. Two coats of Robex Hi-Build PU were then applied incorporating an aggregate in the first coat. The PU system was chosen specifically for its flexibilty.